
Mobile Home Land Check
Will this land take a mobile home?
Do not put a deposit on a home before you know the land will take it. A failed perc test, a setback your double-wide won't fit, a road the transport truck can't use — find it now.
For homes in North Carolina. Send the request first, then pay to start.

Three questions, answered before you buy
Can a mobile home go there? Zoning, setbacks and flood zones for this parcel.
Can the transport truck get the home in? Road access to the spot where the home will sit.
What will the county make you do first? Septic, well and the permit path, checked before you buy.
$125
Everything on record about this land, read for a mobile home — what clears, what costs more, and exactly who at the county to ask.
Once the land checks out, the installation is the bigger part of the bill — get our quote for it.
Tell me about your project. The quote is free.
I'll call you to learn about your project, then give you one price in writing for the work.
Prefer to talk?Call now8 AM–8 PM
Which order your project runs in
The land questions get answered either way. The only thing that changes is whether they are answered before or after the money.
Where it goes wrong
Buy first, permit second
- Choose the home and sign.
- Money goes down.
- Then the land is checked — zoning, septic, flood, access, setup.
If the land will not take that home, the money is already committed.
What a Land Check changes
Check first, buy second
- The land is checked.
- You learn what this parcel will and will not take.
- Then you choose the home.
You can still change the home, change the site, or walk away.
What the report looks like
Every finding says what was checked, what was found, and who confirms it.
Mobile Home Land Check
Example — not a real property
Transport and access
Stop risk
Recorded easement 18 ft. One bend tighter than the transport turning radius.
Zoning and placement
Allowed
Doublewide permitted. Minimum 24 ft width and 4:12 roof pitch apply.
Septic
Not determined
No permit history on file. County soil evaluation required.
Slope and foundation
Adds cost
Pier height passes 36 in. Engineered plans triggered.
Flood
Clear
Zone X. No base flood elevation requirement.
Recorded acreage
Records disagree
The deed says 1.58 acres. County mapping says about 1.69. You see both. We do not pick one for you.
Plus 13 more checks, including water, power distance, wetlands, covenants, and tax status.
Do next: order the county soil evaluation before you sign.

Read a real one
A full Land Check on 3.48 acres in Randolph County. Not a customer's land. Page 1 gives three findings; the rest shows septic, zoning, the ground, flood, access, cost, and who to call.
Open the sample report (PDF, 10 pages)What you get
Nine pages of decision, then the maps behind them.
Page 1
The determination
Readable before you sign: what this land means for the project, and the one thing that matters most.
Page 2
The property, seen
An aerial map with your parcel outlined, plus acreage, frontage and zoning.
Pages 3-7
The findings that matter
One page per domain with something real to say. Each carries a map or diagram.
Page 8
What moves your budget
The site conditions that change cost, ranked, with the reasoning shown.
Page 9
What to do next
Who to contact, what to bring, what to ask, and what it usually costs.
Behind it
The evidence
Every map with its source and date, built to hand to a surveyor or the county. An index entry naming a document is not the document, and we say which one we have.
Your report pulls everything on record about this land and reads it for a mobile home: zoning, deed and subdivision restrictions, flood zone, soil and septic, access, topography. You'll know what clears, what will cost more, and the one question only the county can answer — with the office, the contact and the question written for you.
We check the parcel before you owe anything
Some parcels do not have enough public record behind them to write an honest report. We look first. If yours is one of them, we say so.
When we confirm the parcel, we tell you when to expect the report. We would rather give you a date we can keep than a promise we have not tested.
Still choosing the land? Read what to check before buying land for a mobile home and how to estimate land development costs.
Who checks the work
Reviewed by a manufactured home setup contractor and dealer.
- Works on manufactured home transport and installation full time
Every report is read and approved before it is sent.
For homes in North Carolina. Send the request first, then pay to start.
Land already settled? Get a free quote for your mobile home installation.
Common Questions
Short answers for a mobile home project.
Is a Land Check worth $125?
If you haven't bought the land yet, yes. When land won't take a mobile home the way you planned, you usually find out after the money is spent. Typical ranges to plan with:
- Soil that won't take a conventional septic system: an alternative system runs $8,000–$18,000.
- No public water at the lot: a new well runs $7,000–$18,000.
- A building pad that needs real grading: $1,500–$5,000 per pad.
- A home set where it can't stay: moving a single-wide again runs $3,000–$8,000.
And some land never takes a mobile home at all, because the zoning, a town's rules or the deed says no. Then the land itself is the loss. A Land Check tells you for $125, before you buy.
Check my land — $125 →What should I check before choosing land for a mobile home?
Then the land is checked — zoning, septic, flood, access, setup. Plus 13 more checks, including water, power distance, wetlands, covenants, and tax status. Start with our North Carolina mobile home placement checks to organize the questions for the exact property.


