My Manufactured Home Guide
A wooded lot with survey stakes in the ground, before anything has been cleared or built.

Mobile Home Land Check

Will this land take a mobile home?

Do not put a deposit on a home before you know the land will take it. A failed perc test, a setback your double-wide won't fit, a road the transport truck can't use — find it now.

For homes in North Carolina. Send the request first, then pay to start.

Prefer to talk?Call now8 AM–8 PM

A Land Check in 18 seconds
Page 1 of the sample Land Check: three findings — a state-maintained road, septic soil rated somewhat limited, and a mobile home allowed in district RA — then the contents.
A real Land Check from Randolph County. Page 1 answers the three questions that decide the land.Open the full sample

Three questions, answered before you buy

  1. Can a mobile home go there? Zoning, setbacks and flood zones for this parcel.

  2. Can the transport truck get the home in? Road access to the spot where the home will sit.

  3. What will the county make you do first? Septic, well and the permit path, checked before you buy.

$125

Everything on record about this land, read for a mobile home — what clears, what costs more, and exactly who at the county to ask.

Once the land checks out, the installation is the bigger part of the bill — get our quote for it.

Tell me about your project. The quote is free.

I'll call you to learn about your project, then give you one price in writing for the work.

Phone or email — I need one to reach you
What do you need? Tap any that apply (optional).

You'll hear directly from me — the same person from the quote to the keys.

Prefer to talk?Call now8 AM–8 PM

Which order your project runs in

The land questions get answered either way. The only thing that changes is whether they are answered before or after the money.

Where it goes wrong

Buy first, permit second

  1. Choose the home and sign.
  2. Money goes down.
  3. Then the land is checked — zoning, septic, flood, access, setup.

If the land will not take that home, the money is already committed.

What a Land Check changes

Check first, buy second

  1. The land is checked.
  2. You learn what this parcel will and will not take.
  3. Then you choose the home.

You can still change the home, change the site, or walk away.

What the report looks like

Every finding says what was checked, what was found, and who confirms it.

Mobile Home Land Check

Example — not a real property

  • Transport and access

    Stop risk

    Recorded easement 18 ft. One bend tighter than the transport turning radius.

  • Zoning and placement

    Allowed

    Doublewide permitted. Minimum 24 ft width and 4:12 roof pitch apply.

  • Septic

    Not determined

    No permit history on file. County soil evaluation required.

  • Slope and foundation

    Adds cost

    Pier height passes 36 in. Engineered plans triggered.

  • Flood

    Clear

    Zone X. No base flood elevation requirement.

  • Recorded acreage

    Records disagree

    The deed says 1.58 acres. County mapping says about 1.69. You see both. We do not pick one for you.

Plus 13 more checks, including water, power distance, wetlands, covenants, and tax status.

Do next: order the county soil evaluation before you sign.

Example layout. Findings shown are illustrative, not a real parcel.
Page 1 of the sample Land Check: three findings — a state-maintained road, septic soil rated somewhat limited, and a mobile home allowed in district RA — then the contents.

Read a real one

A full Land Check on 3.48 acres in Randolph County. Not a customer's land. Page 1 gives three findings; the rest shows septic, zoning, the ground, flood, access, cost, and who to call.

Open the sample report (PDF, 10 pages)
  • Page 2 of the sample Land Check: the parcel outlined on an aerial photograph, with acreage, boundary, road access and zoning beside it.

    Page 2 — the parcel on the aerial

  • Page 5 of the sample Land Check: a drawing of a double-wide on its piers over this land's slope — the ground falls about half a foot under a home-sized spot, so no pier stands over 36 inches.

    Page 5 — the ground and the pier plate

  • Page 9 of the sample Land Check: who to call, in order, each office with its checked phone and address.

    Page 9 — who to call, every office with its checked phone and address

What you get

Nine pages of decision, then the maps behind them.

  1. Page 1

    The determination

    Readable before you sign: what this land means for the project, and the one thing that matters most.

  2. Page 2

    The property, seen

    An aerial map with your parcel outlined, plus acreage, frontage and zoning.

  3. Pages 3-7

    The findings that matter

    One page per domain with something real to say. Each carries a map or diagram.

  4. Page 8

    What moves your budget

    The site conditions that change cost, ranked, with the reasoning shown.

  5. Page 9

    What to do next

    Who to contact, what to bring, what to ask, and what it usually costs.

  6. Behind it

    The evidence

    Every map with its source and date, built to hand to a surveyor or the county. An index entry naming a document is not the document, and we say which one we have.

Your report pulls everything on record about this land and reads it for a mobile home: zoning, deed and subdivision restrictions, flood zone, soil and septic, access, topography. You'll know what clears, what will cost more, and the one question only the county can answer — with the office, the contact and the question written for you.

We check the parcel before you owe anything

Some parcels do not have enough public record behind them to write an honest report. We look first. If yours is one of them, we say so.

When we confirm the parcel, we tell you when to expect the report. We would rather give you a date we can keep than a promise we have not tested.

Still choosing the land? Read what to check before buying land for a mobile home and how to estimate land development costs.

Who checks the work

Reviewed by a manufactured home setup contractor and dealer.

  • Works on manufactured home transport and installation full time

Every report is read and approved before it is sent.

For homes in North Carolina. Send the request first, then pay to start.

Land already settled? Get a free quote for your mobile home installation.

Common Questions

Short answers for a mobile home project.

Is a Land Check worth $125?

If you haven't bought the land yet, yes. When land won't take a mobile home the way you planned, you usually find out after the money is spent. Typical ranges to plan with:

  • Soil that won't take a conventional septic system: an alternative system runs $8,000–$18,000.
  • No public water at the lot: a new well runs $7,000–$18,000.
  • A building pad that needs real grading: $1,500–$5,000 per pad.
  • A home set where it can't stay: moving a single-wide again runs $3,000–$8,000.

And some land never takes a mobile home at all, because the zoning, a town's rules or the deed says no. Then the land itself is the loss. A Land Check tells you for $125, before you buy.

Check my land — $125 →

What should I check before choosing land for a mobile home?

Then the land is checked — zoning, septic, flood, access, setup. Plus 13 more checks, including water, power distance, wetlands, covenants, and tax status. Start with our North Carolina mobile home placement checks to organize the questions for the exact property.