My Manufactured Home Guide

Footers and piers

Who pours footers for a mobile home?

Two trades pour footers for a manufactured or mobile home: a mason, or the grading and site-prep contractor who is already on the lot. Many do both.

Short answer: Footers are the concrete the home sits on — poured footings under each block pier, or a perimeter footing for a pier-and-beam setup. The layout comes from the home's installation manual or an engineered foundation plan, not from the contractor's preference. A mason or a site-prep contractor digs and pours them; the setup crew then sets the block piers and the home. Your county may inspect the footers before the home is set, so ask before you schedule the delivery.

Reviewed by a manufactured home setup contractor and dealer.

Manufactured Home Land Check

Buying land for a mobile home? The Land Check reads the county's own permit rules for the one parcel you give us, and says where each answer came from and when.

$125. Asking takes no payment and places no order.

Check this land before you buy it

What is true in North Carolina

In North Carolina, manufactured home set-up contractors, dealers and manufacturers are licensed by the Office of State Fire Marshal's Manufactured Building Division, and the licence can be looked up.
NC Office of State Fire Marshal, Manufactured Building licensing · checked 2026-08-31

What to check first

Start with the exact property, quote, record, or job detail behind your question. Mark what is confirmed, what still needs a current source, and who must answer it. Use the checklist to keep the next call, document, or decision clear.

Digging, forming, and pouring concrete footers and footings to the home's pier layout.

Block piers set on the footers, or a perimeter footing for a pier-and-beam foundation.

Redoing footers or piers that failed inspection or settled after the home was set.

Step 1

The home's installation manual or engineered foundation plan, with the pier layout.

Step 2

The home's dimensions and its serial or model number.

Step 3

Your county's permit and footer inspection requirements.

Details to Sort

The checks that usually matter before you commit money.

What the job includes

Digging to the depth the plan calls for, forming, pouring and finishing the concrete, and often setting the block piers on top. If the ground is rock, wet or sloped, the price and the schedule change, and the contractor should say how before starting.

Where it sits in the build

Footers come after the pad is graded and the driveway is in — the concrete truck needs it — and before the home is transported and set. Get the pier layout in hand before you call anyone.

Tell us the job and the ZIP. The request goes to the poured footers category, where contractors who do this work see it.

Request a poured footers contractor

Secondary Support

Need more help understanding your situation?

Use the project router first, then share details for review if you still need help organizing the project context. This does not guarantee a provider match or availability.

Project Guide

Ask about poured footers

Share a few details to get an immediate starting point, likely next steps, useful guides, and relevant contractor categories. You do not need to know the exact permit or contractor type yet.

Add more project details (optional)

These details can help, but you can leave this closed if you are not sure yet.

Common questions

Are poured footers always required?

Not everywhere. Some counties accept the state installation standard's pier footings without a poured footer; others require poured footers or an engineered plan. It is a county-by-county answer — the installation manual sets the minimum, and the county can add to it.

Does the setup contractor pour the footers?

Sometimes. Many setup crews set block piers on footers someone else poured; some do the whole thing. Ask the setup contractor and the footer contractor the same question — who pours, who sets the piers — so nothing falls between them.

What do I need before I get a price?

The home's pier layout from the installation manual or an engineered plan, the home's dimensions, and photos of the graded pad and the drive the truck will use.