Zoning: does the district allow a mobile home?
Ask the county planning office — or the town's, if the lot is inside town limits — which zoning district the parcel is in and whether that district allows a manufactured (mobile) home. Some districts allow one outright, some only with conditions such as a minimum size, a roof pitch or skirting, and some not at all.
Minimum lot size and setbacks come from the same zoning rules, so ask for those too. A lot can be big enough on paper and still be too narrow once the setbacks are measured.
North Carolina law prohibits a local government from adopting or enforcing zoning that has the effect of excluding manufactured homes from its entire zoning jurisdiction, and from excluding them based on the age of the home. A county can still limit them to certain districts. NC General Statutes, G.S. 160D-910, checked 2026-08-30.
Deed restrictions: the rule zoning doesn't show
Deed restrictions and covenants are private rules recorded with the land. They can rule out a mobile home even where zoning allows one, and the county's zoning answer does not tell you about them.
Read the deed and any recorded covenants or HOA rules before you buy, and check that the deed, the tax map and the survey agree on the lines.
Septic and soil: can the land get a permit?
If there is no public sewer, the home needs a septic system, and the county health department decides whether the soil can take one. Land that cannot get a septic permit cannot take a home on septic, however cheap the lot.
An old septic system on the land is not an approval for a new home. Ask the health department what a new home on this lot needs.
No person shall commence or assist in the installation, construction or repair of a wastewater system unless an improvement permit and a construction authorization have been obtained. The county health department issues them. NC General Statutes, G.S. 130A-336, checked 2026-08-30.
Access: a way in for the home
The lot needs legal access — road frontage or a recorded easement — and a driveway a transport truck can actually use to bring the home in. A narrow, steep or soft way in can stop the transport.
If the driveway will meet a state road, the entrance needs a permit from NCDOT.
Cutting a new entrance into a state road requires a written permit from the NC Department of Transportation. The statute covers any opening or interference in a state road or highway. NC General Statutes, G.S. 136-93, checked 2026-08-29.
Flood: is the lot in a mapped flood area?
Check the flood map for the parcel. Building in a flood hazard area is not always ruled out, but the county sets extra requirements there, such as how high the home must sit, and a permit for the work.
The flood hazard area is designated by the local government, and the local government grants the permits for regulated uses inside it. NC General Statutes, G.S. 143-215.52 and G.S. 143-215.54, checked 2026-08-29.
Utilities: power and water
Find out whether power and public water reach the road at this lot. If they don't, the land needs a power run from the nearest pole and a well, and both belong in the budget before you buy.
The power company decides where service comes in; the county health department permits a private well.