The opt-in zoning chapter, the permitted-use list, the mobile home building permit, the park standards and the one-home-per-lot rule are read from the Beaufort County Code of Ordinances, 2019 supplement, read 2026-09-08.
The setbacks and the lot width are read from the county's Subdivision Regulations, amended and effective 2019-04-01, read 2026-09-08. The same five numbers appear in the online code seventeen years apart, which is why they are stated here.
The flood and coastal rules are read from the county's Flood Damage Prevention Ordinance effective 2020-06-19, read 2026-09-08. Pages 2-18 and 27-29 of that document were not read; nothing on this page rests on them.
The permit contents, the inspection order and the skirting statement are from the county's published manufactured-home permit brochure, read 2026-09-08.
The absence of a skirting requirement in the code was measured twice, over two independently retrieved copies of the county's code with different supplement dates, 2026-09-08.
The coastal high hazard count is from FEMA's National Flood Hazard Layer, read 2026-09-08: 24 VE areas in the county, base flood elevations 5 to 12 feet.
The jurisdiction shares are measured from the state address file and the state's town-limit and planning-area map, 2026-09-08: 31,330 addressed sites, about 59 in 100 governed by the county.
The seven town ordinances were not read. Everything on this page applies outside town limits and town planning areas only.
Whether skirting is required, and by what instrument, is UNKNOWN and is recorded as a conflict between the county's code and the county's brochure — it is not resolved here.
Whether the coastal high hazard prohibition on manufactured homes reaches into the Coastal A zone is UNKNOWN.
No written answer from Beaufort County Planning or Inspections is on file for this page.
This page carries the offices, not staff names.
No zoning determination, permit outcome, flood determination, septic approval, or inspection result is implied.