Marriage line and structural close-up
The marriage line is where home sections meet. The documented installation scope can include positioning, alignment, structural connections, floor and roof close-up, weather seals, and related work. Which tasks apply and who performs them must come from the actual instructions, approved documents, and contracts.
HVAC crossover work
Multi-section homes may have field-connected ducts, equipment, controls, or other HVAC scope. Ask who connects, seals, tests, starts, documents, and corrects the system. Do not treat structural close-up as proof that HVAC work is complete.
Plumbing and electrical crossovers
Water, drain, vent, wiring, bonding, or other field connections can require separate licensed trade scopes and inspections. Ask what arrived factory-complete, what is field-installed, who tests it, and which permit or inspection record closes the work.
Retailer, installer, trades, and homeowner roles
The retailer should state package scope and exclusions. The setup contractor performs the retained installation work. Licensed trades handle their retained systems. A trim provider may handle finish work. An engineer handles only retained design or evaluation. The homeowner coordinates documents, access, questions, and written handoffs.
What to have ready
Have the home make, model, serial and section information, installation instructions, approved plans, dealer quote, setup contract, trade scopes, delivery and setup dates, photos, inspection notes, utility status, and a list of open items by system.
Cost and schedule drivers
Section count, home dimensions, access and staging, weather exposure, equipment needs, foundation readiness, alignment and close-up scope, utility crossover complexity, finish work, required tests, inspection sequencing, excluded work, and corrections can affect cost and timing.
Questions to ask before work begins
Ask who protects the sections from weather; who owns structural, roof, floor, exterior, interior, HVAC, plumbing, electrical, and trim scope; what must be ready first; what remains visible; which tests or inspections apply; who documents completion; and how gaps or corrections are authorized.