My Manufactured Home Guide

North Carolina County and Code Starting Points

Carteret County Manufactured Home Starting Points

Carteret County publishes a separate list for manufactured homes, and it asks for something no inland county's list does: the home's wind zone. The county's own instruction is to obtain the permit before the home is moved, because a home may not be allowed here. Coastal permits and town approvals sit ahead of the county permit.

Manufactured Home Land Check

Will this Carteret County land take a manufactured home? Find out before you commit to buying the land, or the home.

Buying land, already own it, or selling it — one report on what the county and the land will allow.

Need a set-up crew, poured footers or skirting in Carteret County?

One request, free for you. Pick the work:

Common Questions

Mobile homes in Carteret County, answered from the county's own sources.

Can I put a mobile home on my land in Carteret County?

Carteret County publishes a separate list for manufactured homes, and it asks for something no inland county's list does: the home's wind zone. The county's own instruction is to obtain the permit before the home is moved, because a home may not be allowed here. Coastal permits and town approvals sit ahead of the county permit. Source: Permit Application Process, reviewed 2026-09-08.

What permits does a mobile home need in Carteret County?

The county says to get the permit first, and gives the reason. This is the sentence on the county's page, and it is the one that decides whether a particular home can be used here at all. Source: Permit Application Process, reviewed 2026-09-08.

What happens if the land is in a flood zone in Carteret County?

Seven towns approve before the county issues. The county states this on the same page: where development is inside one of these jurisdictions, the applicant must first obtain planning, zoning and floodplain approval from the town. Source: Permit Application Process, reviewed 2026-09-08.

Manufactured Home Placement Questions

Start with what the sources actually support.

The county's manufactured-home list is separate from its building-permit list, and the page says so

The home's wind zone is asked for alongside its cost, size, year and make

The county says to get the permit before the home is moved, because it has wind zone requirements

Wastewater authorization or an operation permit from Environmental Health

CAMA permits where applicable — a coastal layer inland counties do not have

Notarized statements from contractors and sub-contractors

Seven towns must give planning, zoning and floodplain approval before the county can issue

New construction in the unincorporated county inside the 100-year FEMA flood zone also meets the county's flood ordinance

Carteret County Local Process Guide

Official-source-backed starting points and questions to verify.

These sections organize the public source links already reviewed for this page. Where a source does not answer a project-specific question, the item is framed as something to ask the county, AHJ, utility company, licensed professional, dealer, setup contractor, or responsible provider.

Before the home moves

The county says to get the permit first, and gives the reason.

This is the sentence on the county's page, and it is the one that decides whether a particular home can be used here at all.

  • The county writes: obtain a permit before moving your manufactured home — you want to be sure your home is allowed in Carteret County, because the county has certain requirements with regards to wind zones.
  • The manufactured-home list asks for the cost, size, year, make and wind zone of the home.
  • The page does not state which wind zone is required. That is a question for Planning & Development, and this page does not answer it from elsewhere.

The manufactured-home list

What the county asks for, in its own order.

The county publishes this list separately from its building-permit list, whose own note says that list applies to frame houses, accessory buildings, garages, decks, porches and docks.

  • A copy of the authorization for wastewater, or the operation permit, from Environmental Health.
  • Completed CAMA permits if applicable, and a completed building permit application packet.
  • A plot plan of the property showing the setbacks of the manufactured home from all property lines.
  • Notarized statements from contractors and sub-contractors.
  • The cost, size, year, make and wind zone of the manufactured home.

Who approves first

Seven towns approve before the county issues.

The county states this on the same page: where development is inside one of these jurisdictions, the applicant must first obtain planning, zoning and floodplain approval from the town.

  • Atlantic Beach, Bogue, Cape Carteret, Cedar Point, Emerald Isle, Indian Beach and Peletier.
  • The county states that a permit cannot be issued by Carteret County until that town approval is obtained.
  • The county keeps two permitting offices, a main office in Morehead City and a western office in Cedar Point, and inspections are scheduled by calling one of them with the permit number.

Flood

The flood requirement as the county states it.

The county states this under its building-permit list rather than its manufactured-home list, and it is written to cover all new construction in the unincorporated county. It is quoted here with that scope attached rather than restated as a manufactured-home rule.

  • All new construction in unincorporated Carteret County located in a Special Flood Hazard Area — the 100-year FEMA defined flood zone — must also meet the requirements of the Carteret County Flood Damage Prevention and Protection Ordinance.
  • The county names a Floodplain Manager among the officials whose approval a complete application needs.

Local Prerequisites To Verify

Environmental health, utilities, zoning, and access may shape the sequence.

Septic approval or existing-system review

County sources often require septic approval, construction authorization, or existing-system authorization before or alongside manufactured-home permitting.

Well or water availability

County sources may require well, public water, or water-sewer tap documentation before a permit can move forward.

Water/sewer availability

Some county sources ask for sewer approval, tap receipts, or public water documentation when applicable.

Utility service availability

Some county sources connect power release or final readiness to completed trade inspections or utility-provider steps.

Zoning or land-use review

County sources may require zoning, municipal zoning, watershed, floodplain, or land-use review before manufactured-home placement.

Inspection-Related Scopes

Limited to source-backed manufactured-home scopes.

Grading and Site Preparation

Use only where source-backed county or state guidance ties grading to pad, drainage, foundation readiness, access, footers, or setup readiness.

Several county sources reference site grading, drainage, footings, setup readiness, or documents needed before power or final signoff.

Transport and Setup

Core manufactured-home installation scope for delivery, setup, pier/blocking, anchoring, tie-downs, setup contractor information, and inspection readiness.

The NC Installation Manual is the primary statewide installation source; county manufactured-home process pages may add local setup contractor, permit, and inspection steps.

Electrical

Electrical service, site-installed electrical work, utility handoffs, and inspection readiness when source-backed.

County sources commonly separate electrical permits or inspections for mobile/manufactured-home setup.

Plumbing

Plumbing connections, water and waste lines, pressure or water tests, and final readiness where source-backed.

County sources commonly separate plumbing permits or inspections for mobile/manufactured-home setup.

HVAC

Mechanical systems, heat pump or air-conditioning work, ducting, and final readiness where source-backed.

County sources commonly reference mechanical permits or inspections for mobile/manufactured-home setup.

Propane / Gas

Use only when official guidance mentions gas service, gas appliance connections, LP systems, fuel-gas inspection, pressure testing, shutoffs, or installation-manual requirements.

Onslow County explicitly groups gas fuel work with prescriptive code and NC manufactured-home regulations for manufactured-home permits.

Decks / Stairs / Landings / Handicap Ramps

Egress, steps, landings, handrails, ramps, deck thresholds, and final access readiness where source-backed.

County manufactured-home guides may reference stoops, steps, landings, handrails, and deck-size thresholds.

Masonry / Block / Foundation

Footings, piers, blocking, masonry skirting/foundation presentation, soil bearing, anchorage, and foundation readiness where source-backed.

County sources reference footings, piers, blocking, anchorage, soil bearing, tie-downs, or foundation-related items in inspection processes.

Vinyl Skirting

Skirting or underpinning only where source-backed guidance connects it to inspection timing, access, ventilation, appearance, or placement requirements.

County manufactured-home inspection documents may reference skirting timing, access panels, or underpinning requirements.

Trim-Out / Carpentry

Use only where official guidance touches final trim-out, marriage line completion, close-up, access panels, finish details, weatherproofing, or readiness for final inspection.

Onslow County references marriage wall inspection for multi-wide homes and close-up type items within manufactured-home setup inspections.

Questions To Ask The County

Bring better questions to the right local office.

What wind zone is this home built to, and what does Carteret County require? The page asks for the wind zone and does not state the requirement.

Is the parcel inside one of the seven towns? If so, the town's planning, zoning and floodplain approval comes before the county permit.

Is the parcel in a Special Flood Hazard Area, and what does the county's flood ordinance require of the home?

Does the project need a CAMA permit, and who applies for it?

Which contractors and sub-contractors have to provide notarized statements, and when?

Dealer Quote Responsibility Questions

Ask who owns each step before the project depends on it.

What wind zone is this home built to? Ask before any deposit, and ask the county what it requires.

Who confirms with Carteret County that this specific home is allowed here, and when — before or after it is bought?

Who obtains the CAMA permit if one applies?

Which contractors are providing notarized statements, and who collects them?

Who applies to the town for planning, zoning and floodplain approval if the parcel is inside one?

What To Gather

Better details make county and provider questions clearer.

Property address and parcel number, and whether the parcel is inside one of the seven named towns.

The home's wind zone, cost, size, year and make.

Whether the parcel is in a Special Flood Hazard Area.

Whether the site is on septic, and whether the system is existing or new.

Whether the project needs a CAMA permit.

The contractor and sub-contractor list with licence numbers.

Related provider types

Related project stages

Source notes

SCOPED HONESTLY: the county asks for the home's wind zone and states that it has wind zone requirements. It does not publish what those requirements are on this page, and this page does not supply a number from elsewhere. Ask Planning & Development before buying a home for this county.

The flood sentence is quoted with the scope the county gave it — all new construction in unincorporated Carteret County — because the county states it under its building-permit list rather than its manufactured-home list.

What each of the seven towns requires is not stated on the county's page and is not stated here.

Retrieved 2026-09-08. County web pages change without a version line; confirm with Planning & Development before relying on any item.

No permit outcome, flood determination, wind zone determination, or approval is implied.

Helpful Next Steps

Move from Carteret County questions into the right My Manufactured Home Guide path.

Use these pages to organize the next question by stage, responsibility, utility path, setup readiness, or private project summary. They do not replace county, utility, AHJ, or professional confirmation.

Manufactured Home Land Check

Will this Carteret County land take a manufactured home? Find out before you commit to buying the land, or the home.

Buying land, already own it, or selling it — one report on what the county and the land will allow.