A utility line or pole is close to the homesite
Visible infrastructure does not establish the serving utility, available service point, capacity, extension policy, route, equipment, responsibility, charge, or schedule.
Give the likely utility the property address or parcel and proposed home and meter location, then request its property-specific service process.
The quote says electrical hookup is included
That phrase may not identify utility work, line extension, temporary service, meter or pedestal equipment, trenching, conduit, electrician labor, inspections, corrections, or energization.
Mark each utility, site, equipment, trade, inspection, and correction line as included, excluded, allowance-based, or still unknown.
Underground service is preferred
Preference alone does not settle route, easement, excavation, private-line locating, site restoration, equipment, inspection, or cost responsibility.
Ask the serving utility and licensed electrician which documents and field information they need before either scope can be priced.
Two power quotes assume different utility work
One scope may include utility charges, site access, excavation, poles or conduit, meter equipment, electrician work, inspections, corrections, or restoration that the other assigns elsewhere or leaves conditional.
Attach the same utility response and responsibility sheet to both requests, then compare each category as included, excluded, allowance-based, customer-furnished, utility-furnished, or unresolved.
A utility or electrician supplied a number
One number may exclude the other party's work plus clearing, access, trenching, conduit, equipment, inspections, corrections, restoration, temporary service, or return trips.
Put the serving-utility response and electrician proposal into one responsibility table and mark route, quantities, ownership point, customer work, prerequisites, allowances, exclusions, release, energization, restoration, and schedule assumptions.
How much does it cost to run electricity to a mobile home?
A nearby pole or distance estimate cannot establish the cost. The utility and customer scopes, route, extension policy, equipment, site work, electrician work, inspection and release steps, restoration, allowances, and exclusions must be defined for the parcel.
Put the dated utility response and electrician proposal into one comparison table, then mark every route assumption, quantity, responsibility, allowance, exclusion, correction, restoration, and schedule dependency before comparing totals.