My Manufactured Home Guide

North Carolina County and Code Starting Points

Cabarrus County Manufactured Home Starting Points

Cabarrus County does not answer "where is a manufactured home allowed" with a district. A manufactured home — a mobile home in everyday words — is allowed only where a Manufactured Home Overlay has been applied to that particular land, and the county's own published map holds twenty-five of them for the whole county. Without an overlay the answer is no, and getting one is a rezoning. Where an overlay exists, the home is treated like a house and needs a brick curtain wall in every district but the rural one.

Manufactured Home Land Check

Will this Cabarrus County land take a manufactured home? Find out before you commit to buying the land, or the home.

Buying land, already own it, or selling it — one report on what the county and the land will allow.

Need a set-up crew, poured footers or skirting in Cabarrus County?

One request, free for you. Pick the work:

Common Questions

Mobile homes in Cabarrus County, answered from the county's own sources.

Can I put a mobile home on my land in Cabarrus County?

Cabarrus County does not answer "where is a manufactured home allowed" with a district. A manufactured home — a mobile home in everyday words — is allowed only where a Manufactured Home Overlay has been applied to that particular land, and the county's own published map holds twenty-five of them for the whole county. Without an overlay the answer is no, and getting one is a rezoning. Where an overlay exists, the home is treated like a house and needs a brick curtain wall in every district but the rural one. Source: Cabarrus County Development Ordinance, reviewed 2026-09-11.

Which zoning districts in Cabarrus County allow a mobile home?

There is no district answer. There is a parcel answer. A house is allowed by right in all five residential districts. The manufactured home's line in the same table carries no mark in any column — it carries a sentence saying an overlay is required. Source: Cabarrus County Development Ordinance, reviewed 2026-09-11.

What setbacks and lot size does Cabarrus County require for a mobile home?

The home is dimensioned exactly like a house. The ordinance says a manufactured home on its own lot meets the same setbacks, yards, enclosures, access, parking and square-footage standards as a conventional single-family home on the same lot. Source: Cabarrus County Development Ordinance, reviewed 2026-09-11.

Do I need a septic or well permit in Cabarrus County?

Three acres in the rural district, and public water and sewer are not permitted there. Cabarrus is unusual: most counties cut the lot minimum when utilities are available. Here the utilities are excluded from the rural districts and the lot floor is three acres because of it. Source: Cabarrus County Development Ordinance, reviewed 2026-09-11.

Can I put a mobile home in a park or community in Cabarrus County?

A brick curtain wall — except in a park, and except in the rural district. The ordinance requires a continuous brick curtain wall, or a foundation of brick or split-faced block, under the outer perimeter of the home, unpierced except for ventilation and access. Source: Cabarrus County Development Ordinance, reviewed 2026-09-11.

Manufactured Home Placement Questions

Start with what the sources actually support.

Permission is an overlay on the land, not a zoning district

The county's published overlay map holds 25 overlays for the whole county

MH-1 allows a single-wide or a double-wide; MH-2 allows a double-wide only

No park overlay exists anywhere — every new park is a rezoning

Without an overlay, the answer is no until the land is rezoned

Three acres minimum in the rural district, and public water and sewer are not permitted there

A brick curtain wall, except in a park and except in the rural district

A 3-in-12 roof pitch on a single-wide only

The hitch may stay if it is screened

Two homes on one parcel is a park, and a park needs five acres

Cabarrus County Local Process Guide

Official-source-backed starting points and questions to verify.

These sections organize the public source links already reviewed for this page. Where a source does not answer a project-specific question, the item is framed as something to ask the county, AHJ, utility company, licensed professional, dealer, setup contractor, or responsible provider.

Where a home is allowed

There is no district answer. There is a parcel answer.

A house is allowed by right in all five residential districts. The manufactured home's line in the same table carries no mark in any column — it carries a sentence saying an overlay is required.

  • The overlay is applied to specific land by the Board of Commissioners, parcel by parcel, through a rezoning.
  • Without an overlay on the land, a manufactured home is not allowed, whatever the underlying district is.
  • So the only way to answer "may I put a manufactured home on this land" is to look up the overlay on that parcel.
  • A modular home built to the state building code is not covered by any of this — the ordinance treats it as a stick-built house.

The three overlays

MH-1, MH-2 and MHP — and MH-2 does not allow a single-wide.

The ordinance sorts homes into Type I, a single-section home, and Type II, a multi-section home.

  • MH-1: Type I and Type II, permanent installations only.
  • MH-2: Type II only — a double-wide. A single-wide is not allowed on MH-2 land.
  • MHP: a manufactured home park, plus Type I and Type II outside a park, plus recreational vehicles for up to 180 days on no more than one space in ten.

What the map actually holds

The county's published overlay map holds 52 shapes, and 25 of them are overlays.

Read from the county's own published overlay layer, 2026-09-08. The counts are small and they decide the answer for most buyers.

  • MH-2 (double-wide only): 19 areas.
  • MH-1 (single-wide or double-wide): 6 areas.
  • MHP (park): none. No parcel in the county carries a park overlay, so every new park is a rezoning.
  • 27 of the 52 shapes carry the code NOMH, which does not appear anywhere in the adopted ordinance. Its name reads as a prohibition and what it does cannot be established from the county's own rules. Ask Planning if your parcel carries it.
  • How many addressed sites sit inside an MH-1 or MH-2 area is UNKNOWN — it was not measured and is not estimated here.

Once the overlay exists

The home is dimensioned exactly like a house.

The ordinance says a manufactured home on its own lot meets the same setbacks, yards, enclosures, access, parking and square-footage standards as a conventional single-family home on the same lot.

  • There is no separate manufactured-home lot size, no separation requirement, and no extra yard.
  • The binding constraints in Cabarrus are the overlay, the three-acre lot floor in the rural district, and the impermeable-surface cap.

Lot size and setbacks

Three acres in the rural district, and public water and sewer are not permitted there.

Cabarrus is unusual: most counties cut the lot minimum when utilities are available. Here the utilities are excluded from the rural districts and the lot floor is three acres because of it.

  • AO (Agricultural/Open Space): 3 acres minimum, 0.33 homes per acre, impermeable surface capped at 15%.
  • CR (Countryside Residential) and LDR: 2 acres minimum, 0.5 homes per acre, impermeable surface capped at 20%.
  • Public water and sewer are not permitted in AO or CR, except where the county supplies water for a public health reason.
  • Front yard 75 ft on a minor collector, 50 ft on a local road. Side 20 ft. Rear 30 ft. Average lot width 150 ft.

The one-acre lot

A one-acre lot is possible once per tract — and a previous owner may have used it.

The ordinance allows one minor subdivision with lots of at least one acre out of each parent tract that existed on June 20, 2005. Any further division is a major subdivision.

  • Whether a particular parcel's allowance is still unspent depends on what was divided out since 2005.
  • It is on no map. It is answered from the deed and plat history for the parent tract.
  • Ask the question before you buy land expecting to split it.

Foundation and appearance

A brick curtain wall — except in a park, and except in the rural district.

The ordinance requires a continuous brick curtain wall, or a foundation of brick or split-faced block, under the outer perimeter of the home, unpierced except for ventilation and access.

  • Not required in a manufactured home park, and not required in the AO district — in those two cases other compatible skirting materials may be used.
  • So the brick requirement reaches a home in CR, LDR, MDR and HDR and not in AO.
  • Roof pitch at least 3 in 12 for a single-section home. A multi-section home has no roof pitch requirement.
  • Wheels, axles, transporting lights and removable towing apparatus permanently removed before installation — but the hitch may remain if it is screened from view, and it need not be screened inside a park.
  • A home narrower than 17 ft must be set with its long side parallel to the street. That binds every single-wide and no double-wide.
  • Attached to a permanent foundation system under the state building code.

In a park

Two homes on one parcel is a park, and a park needs five acres.

The ordinance counts two or more manufactured homes on a parcel as a manufactured home park. The minimum site is five acres.

  • So two, three or four homes on under five acres cannot be done at all — and with no MHP overlay on any land in the county, even a compliant five-acre proposal is a rezoning.
  • Space size: 4,000 sq ft for a single-section home, 5,000 for a multi-section. Width 40 ft and 50 ft. Depth 100 ft.
  • The front setback inside a park is stated twice and the two do not agree: 20 ft from the pavement edge in the dimensional table, 30 ft from the pavement edge in the standards. Which one governs is UNKNOWN. Ask before you plan a park.
  • Paved internal street at least 24 ft wide, a 3-ft walkway to every space, and two paved off-street parking spaces per home.
  • 8% of the park developed for recreation; dumpsters at least 40 ft from any home; a buffer yard around the whole perimeter.
  • The park owner is responsible for placement and for any violation.

Flood zone

Few parcels are affected, and the count of them is a range.

Measured from FEMA's flood layer against the county's addresses, 2026-09-08.

  • About 172 addressed sites — roughly 1 in 700 — are in the floodway.
  • Between 339 and 1,176 addressed sites are in the mapped flood zone. The exact number could not be established and is not guessed here.
  • Every mapped flood area in the county is the AE zone. There is no coastal high hazard area here.

Trees and clearing

No rule on cutting trees on your own lot.

The ordinance's tree provisions are planting and screening requirements — buffer yards, parking lots, the park perimeter. None protects an existing tree on a homesite.

  • What does bind is the impermeable-surface cap: 15% in AO, 20% in CR and LDR. It limits what may be paved, not what may be felled.
  • Clearing 1 acre or more needs a sediment and erosion control plan from the state (NCDEQ).

Outside the town line

Three quarters of this county's addresses are inside a town.

Cabarrus is one of the most municipal counties in the library. Everything on this page applies to the quarter that is not.

  • About 23 of every 100 addressed sites are governed by the county.
  • Concord alone holds about 49,600 addressed sites; Kannapolis about 26,200; Harrisburg about 9,200.
  • If the parcel is inside a town or a town's planning area, that town's ordinance governs and this page does not apply.

Local Prerequisites To Verify

Environmental health, utilities, zoning, and access may shape the sequence.

Septic approval or existing-system review

County sources often require septic approval, construction authorization, or existing-system authorization before or alongside manufactured-home permitting.

Well or water availability

County sources may require well, public water, or water-sewer tap documentation before a permit can move forward.

Water/sewer availability

Some county sources ask for sewer approval, tap receipts, or public water documentation when applicable.

Utility service availability

Some county sources connect power release or final readiness to completed trade inspections or utility-provider steps.

Zoning or land-use review

County sources may require zoning, municipal zoning, watershed, floodplain, or land-use review before manufactured-home placement.

Inspection-Related Scopes

Limited to source-backed manufactured-home scopes.

Grading and Site Preparation

Use only where source-backed county or state guidance ties grading to pad, drainage, foundation readiness, access, footers, or setup readiness.

Several county sources reference site grading, drainage, footings, setup readiness, or documents needed before power or final signoff.

Transport and Setup

Core manufactured-home installation scope for delivery, setup, pier/blocking, anchoring, tie-downs, setup contractor information, and inspection readiness.

The NC Installation Manual is the primary statewide installation source; county manufactured-home process pages may add local setup contractor, permit, and inspection steps.

Electrical

Electrical service, site-installed electrical work, utility handoffs, and inspection readiness when source-backed.

County sources commonly separate electrical permits or inspections for mobile/manufactured-home setup.

Plumbing

Plumbing connections, water and waste lines, pressure or water tests, and final readiness where source-backed.

County sources commonly separate plumbing permits or inspections for mobile/manufactured-home setup.

HVAC

Mechanical systems, heat pump or air-conditioning work, ducting, and final readiness where source-backed.

County sources commonly reference mechanical permits or inspections for mobile/manufactured-home setup.

Propane / Gas

Use only when official guidance mentions gas service, gas appliance connections, LP systems, fuel-gas inspection, pressure testing, shutoffs, or installation-manual requirements.

Onslow County explicitly groups gas fuel work with prescriptive code and NC manufactured-home regulations for manufactured-home permits.

Decks / Stairs / Landings / Handicap Ramps

Egress, steps, landings, handrails, ramps, deck thresholds, and final access readiness where source-backed.

County manufactured-home guides may reference stoops, steps, landings, handrails, and deck-size thresholds.

Masonry / Block / Foundation

Footings, piers, blocking, masonry skirting/foundation presentation, soil bearing, anchorage, and foundation readiness where source-backed.

County sources reference footings, piers, blocking, anchorage, soil bearing, tie-downs, or foundation-related items in inspection processes.

Vinyl Skirting

Skirting or underpinning only where source-backed guidance connects it to inspection timing, access, ventilation, appearance, or placement requirements.

County manufactured-home inspection documents may reference skirting timing, access panels, or underpinning requirements.

Trim-Out / Carpentry

Use only where official guidance touches final trim-out, marriage line completion, close-up, access panels, finish details, weatherproofing, or readiness for final inspection.

Onslow County references marriage wall inspection for multi-wide homes and close-up type items within manufactured-home setup inspections.

Questions To Ask The County

Bring better questions to the right local office.

Is the parcel inside Concord, Kannapolis, Harrisburg, Midland, Mount Pleasant or Locust, or one of their planning areas?

Does the parcel carry a Manufactured Home Overlay — and is it MH-1 or MH-2?

If the parcel is marked NOMH on the county's overlay map, what does that mean for a manufactured home?

What does a rezoning to add an overlay cost, how long does it take, and what are the odds?

Has the one-acre minor subdivision allowance for this parent tract already been used since June 20, 2005?

Inside a park, is the front setback 20 feet or 30 feet from the pavement edge?

Dealer Quote Responsibility Questions

Ask who owns each step before the project depends on it.

Has anyone confirmed the parcel carries a Manufactured Home Overlay, and whether it is MH-1 or MH-2?

Is the home a single-section or a multi-section home? On MH-2 land a single-wide is not allowed.

Is a brick curtain wall in the price? It is required outside the rural district.

Does the home need a 3-in-12 roof pitch — that is, is it a single-section home?

Will the hitch remain, and is screening it part of the work?

What To Gather

Better details make county and provider questions clearer.

Property address and parcel identification number.

Whether the parcel is inside a town or a town's planning area.

Whether the parcel carries a Manufactured Home Overlay, and which one.

The home's width, number of sections, length and heated square feet.

The zoning district under the overlay, and the parcel's acreage.

The FEMA flood zone and floodway status for the parcel.

Related provider types

Related project stages

Source notes

The use table, the three overlays, the lot sizes, the curtain wall, the appearance rules and the park standards are read from the Cabarrus County Development Ordinance, read 2026-09-08. Its chapter footers carry amendment dates of 2021-01-19, 2021-07-19 and 2022-01-18.

The overlay counts are read from the county's own published manufactured-home overlay layer, 2026-09-08: 52 shapes, of which 19 are MH-2, 6 are MH-1, none is MHP, and 27 carry a code the ordinance does not contain.

How many addressed sites are inside an MH-1 or MH-2 overlay was NOT measured. The county publishes that layer in a format the measurement tool does not read, and it is stated as UNKNOWN rather than estimated.

What the code NOMH means is UNKNOWN. It is on 27 of the 52 shapes and appears nowhere in the adopted ordinance.

The park front setback is stated as 20 ft in the dimensional table and 30 ft in the standards, both measured from the pavement edge. Which governs is UNKNOWN.

Whether a parcel's one-acre minor subdivision allowance is unspent is a parcel-level question answered from the deed and plat history since 2005-06-20, not from any map.

The flood-zone and floodway counts join FEMA's National Flood Hazard Layer to the state address file, 2026-09-08. The floodway count is exact; the flood-zone count is a range between 339 and 1,176 because overlapping areas could not be resolved into one number.

About 23 of every 100 addressed sites are outside every town and town planning area, measured from the state address file and the state's town-limit and planning-area map, 2026-09-08.

The six town ordinances were not read. Everything on this page applies outside town limits and town planning areas only.

No written answer from Cabarrus County Planning is on file for this page.

This page carries the offices, not staff names.

No zoning determination, permit outcome, flood determination, septic approval, or inspection result is implied.

Helpful Next Steps

Move from Cabarrus County questions into the right My Manufactured Home Guide path.

Use these pages to organize the next question by stage, responsibility, utility path, setup readiness, or private project summary. They do not replace county, utility, AHJ, or professional confirmation.

Manufactured Home Land Check

Will this Cabarrus County land take a manufactured home? Find out before you commit to buying the land, or the home.

Buying land, already own it, or selling it — one report on what the county and the land will allow.