My Manufactured Home Guide

North Carolina County and Code Starting Points

Edgecombe County Manufactured Home Starting Points

Edgecombe County sorts every manufactured home — a mobile home in everyday words — into three classes. A double-wide is allowed by right in all four of the county's home districts. A single-wide is allowed in one, AR-30. A home that does not meet the federal HUD code is allowed nowhere. On its own lot, every home needs a masonry foundation and a curtain wall of brick or vinyl.

Manufactured Home Land Check

Will this Edgecombe County land take a manufactured home? Find out before you commit to buying the land, or the home.

Buying land, already own it, or selling it — one report on what the county and the land will allow.

Need a set-up crew, poured footers or skirting in Edgecombe County?

One request, free for you. Pick the work:

Common Questions

Mobile homes in Edgecombe County, answered from the county's own sources.

Can I put a mobile home on my land in Edgecombe County?

Edgecombe County sorts every manufactured home — a mobile home in everyday words — into three classes. A double-wide is allowed by right in all four of the county's home districts. A single-wide is allowed in one, AR-30. A home that does not meet the federal HUD code is allowed nowhere. On its own lot, every home needs a masonry foundation and a curtain wall of brick or vinyl. Source: Edgecombe County Unified Development Ordinance (PDF), reviewed 2026-09-11.

Which zoning districts in Edgecombe County allow a mobile home?

A double-wide in all four home districts. A single-wide in one. The county's ordinance puts every manufactured home in one of three classes, and the class decides where it may go. Source: Edgecombe County Unified Development Ordinance (PDF), reviewed 2026-09-11.

Can I put a mobile home in a park or community in Edgecombe County?

On your own lot: a masonry foundation and a curtain wall. These rules apply to every manufactured home on its own lot. The foundation and curtain-wall rule does not apply inside a manufactured home park. Source: Edgecombe County Unified Development Ordinance (PDF), reviewed 2026-09-11.

What setbacks and lot size does Edgecombe County require for a mobile home?

Every home district needs a lot 125 ft wide. Front (from the street) / side / rear, in feet, then lot size. The width is the same in every district, so a smaller lot is a shallower lot. Source: Edgecombe County Unified Development Ordinance (PDF), reviewed 2026-09-11.

Can I put more than one mobile home on the land in Edgecombe County?

Two homes on one parcel count as a park — and a park needs five spaces. The ordinance calls any two or more manufactured homes on one parcel a manufactured home park. The park rules then require at least five spaces. Source: Edgecombe County Unified Development Ordinance (PDF), reviewed 2026-09-11.

Manufactured Home Placement Questions

Start with what the sources actually support.

Three classes of manufactured home

A double-wide is allowed in all four home districts

A single-wide is allowed in AR-30 only

A single-section home wider than 12 ft fits no class

Masonry foundation and curtain wall on your own lot

The long side of the home faces the road

Lot width is 125 ft in every home district

Two homes on one parcel count as a park

No new home in the floodway

No tree-cutting rule on your own lot

Edgecombe County Local Process Guide

Official-source-backed starting points and questions to verify.

These sections organize the public source links already reviewed for this page. Where a source does not answer a project-specific question, the item is framed as something to ask the county, AHJ, utility company, licensed professional, dealer, setup contractor, or responsible provider.

Where a home is allowed

A double-wide in all four home districts. A single-wide in one.

The county's ordinance puts every manufactured home in one of three classes, and the class decides where it may go.

  • Class A is a double-wide: two or more sections, each at least 10 ft wide. Allowed by right in AR-30, R-30, R-20 and R-10.
  • Class B is a single-wide: one section, about 12 ft wide or less. Allowed by right in AR-30 only.
  • Class C is a home that does not meet the federal HUD code. Not allowed in any district.
  • The county's zoning covers the whole county outside the towns and their ETJs.

A wider single-section home

A 14-wide or 16-wide single-section home fits none of the three classes.

This is the question to settle before you buy a single-section home for Edgecombe County. The ordinance does not answer it.

  • Class A needs two or more sections. Class B is "approximately 12 feet in width or less." Class C is a home that fails the HUD code.
  • A 14-wide or 16-wide single-section home meets the HUD code and is none of the three.
  • The county's minimum width is 12 ft, so the home is not barred by width. Where it may go is UNKNOWN.
  • Ask the Planning Department which class it will give the exact home, in writing, before you put down a deposit.

The home

On your own lot: a masonry foundation and a curtain wall.

These rules apply to every manufactured home on its own lot. The foundation and curtain-wall rule does not apply inside a manufactured home park.

  • A continuous, permanent masonry foundation AND a curtain wall of solid brick, brick veneer or vinyl. Openings only for vents and access.
  • At least 12 ft wide.
  • The long side of the home parallel to the road frontage, as far as practical.
  • Roof pitch at least 3 in 12, Class C roofing or better, and eaves of at least 6 inches.
  • Siding of vinyl or aluminum lap, wood, stucco, brick or stone.
  • Hitch, wheels, axles and towing lights removed. Stairs and porches built to the state building code.

Lot size and setbacks

Every home district needs a lot 125 ft wide.

Front (from the street) / side / rear, in feet, then lot size. The width is the same in every district, so a smaller lot is a shallower lot.

  • AR-30: 50 / 12 / 35. Lot 30,000 sq ft.
  • R-30: 50 / 12 / 35. Lot 30,000 sq ft.
  • R-20: 50 / 12. Lot 20,000 sq ft. The rear setback was not read.
  • R-10: 25 / 12 / 20. Lot 10,000 sq ft.
  • Example: an R-10 lot at the minimum is 80 ft deep. A 32 × 76 ft double-wide, set long side to the road, fits with 3 ft to spare.
  • A lot on a main road must be 200 ft wide in AR-30.
  • Without public water or sewer, the Health Department may require a larger lot.

Smaller lots in AR-30

An AR-30 lot can drop to 17,800 sq ft — with design rules.

The county's design guidelines are optional. Following them lowers the AR-30 lot minimum by about 40%.

  • The foundation on the side facing the street must be covered in brick, stone or stucco. Vinyl is not allowed there.
  • At least three design features, from a list that includes roof overhangs of 18 inches or more.
  • No blank walls facing a street.
  • Splitting AR-30 land into five or more lots makes it a conservation subdivision, unless every lot is over 10 acres.

Family land

Two homes on one parcel count as a park — and a park needs five spaces.

The ordinance calls any two or more manufactured homes on one parcel a manufactured home park. The park rules then require at least five spaces.

  • So two, three or four homes on one parcel cannot meet the park rules as written. Ask Planning before placing a second home.
  • A park is allowed only by special use permit: in R-20, and on lots inside the Speed Community Overlay in AR-30.
  • A new park must be at least half a mile (2,640 ft) from another park.
  • Each space at least 100 ft wide, and 5,000 sq ft with public water and sewer; 20,000 sq ft without.
  • At least 20 ft between homes. Spaces may not be sold separately while the park operates.

Flood zone

No new home in the floodway.

55 of 24,014 Edgecombe addresses — about 1 in 440 — are in the floodway. The only home allowed there is a replacement in an existing park or subdivision.

  • At least 1,159 addresses — about 1 in 21 — are in the mapped flood zone. That is a floor: only 140 of the county's 276 flood-zone areas could be measured.
  • In the flood zone, masonry or wood underpinning counts as an enclosure and needs flood openings. Flexible skirting does not.
  • Check the FEMA flood map for the parcel before you buy.

Trees and clearing

No rule on cutting trees on your own lot.

The county's tree rules cover required landscaping on development sites, not a homeowner clearing a lot.

  • Where a protected tree 8 inches or more across is removed on a development site, it is replaced tree-for-tree by trunk size.
  • A five-lot conservation subdivision in AR-30 is reached by that rule.
  • Clearing 1 acre or more needs a sediment and erosion control plan from the state (NCDEQ).

Local Prerequisites To Verify

Environmental health, utilities, zoning, and access may shape the sequence.

Septic approval or existing-system review

County sources often require septic approval, construction authorization, or existing-system authorization before or alongside manufactured-home permitting.

Well or water availability

County sources may require well, public water, or water-sewer tap documentation before a permit can move forward.

Water/sewer availability

Some county sources ask for sewer approval, tap receipts, or public water documentation when applicable.

Utility service availability

Some county sources connect power release or final readiness to completed trade inspections or utility-provider steps.

Zoning or land-use review

County sources may require zoning, municipal zoning, watershed, floodplain, or land-use review before manufactured-home placement.

Inspection-Related Scopes

Limited to source-backed manufactured-home scopes.

Grading and Site Preparation

Use only where source-backed county or state guidance ties grading to pad, drainage, foundation readiness, access, footers, or setup readiness.

Several county sources reference site grading, drainage, footings, setup readiness, or documents needed before power or final signoff.

Transport and Setup

Core manufactured-home installation scope for delivery, setup, pier/blocking, anchoring, tie-downs, setup contractor information, and inspection readiness.

The NC Installation Manual is the primary statewide installation source; county manufactured-home process pages may add local setup contractor, permit, and inspection steps.

Electrical

Electrical service, site-installed electrical work, utility handoffs, and inspection readiness when source-backed.

County sources commonly separate electrical permits or inspections for mobile/manufactured-home setup.

Plumbing

Plumbing connections, water and waste lines, pressure or water tests, and final readiness where source-backed.

County sources commonly separate plumbing permits or inspections for mobile/manufactured-home setup.

HVAC

Mechanical systems, heat pump or air-conditioning work, ducting, and final readiness where source-backed.

County sources commonly reference mechanical permits or inspections for mobile/manufactured-home setup.

Propane / Gas

Use only when official guidance mentions gas service, gas appliance connections, LP systems, fuel-gas inspection, pressure testing, shutoffs, or installation-manual requirements.

Onslow County explicitly groups gas fuel work with prescriptive code and NC manufactured-home regulations for manufactured-home permits.

Decks / Stairs / Landings / Handicap Ramps

Egress, steps, landings, handrails, ramps, deck thresholds, and final access readiness where source-backed.

County manufactured-home guides may reference stoops, steps, landings, handrails, and deck-size thresholds.

Masonry / Block / Foundation

Footings, piers, blocking, masonry skirting/foundation presentation, soil bearing, anchorage, and foundation readiness where source-backed.

County sources reference footings, piers, blocking, anchorage, soil bearing, tie-downs, or foundation-related items in inspection processes.

Vinyl Skirting

Skirting or underpinning only where source-backed guidance connects it to inspection timing, access, ventilation, appearance, or placement requirements.

County manufactured-home inspection documents may reference skirting timing, access panels, or underpinning requirements.

Trim-Out / Carpentry

Use only where official guidance touches final trim-out, marriage line completion, close-up, access panels, finish details, weatherproofing, or readiness for final inspection.

Onslow County references marriage wall inspection for multi-wide homes and close-up type items within manufactured-home setup inspections.

Questions To Ask The County

Bring better questions to the right local office.

Is the parcel inside Rocky Mount, Tarboro or another town, or in a town's ETJ?

Which zoning district is the parcel in — AR-30, R-30, R-20 or R-10?

Is the home a double-wide, a single-wide 12 ft wide or less, or a single-section home wider than 12 ft? Which class will the county give it?

Does the parcel front a main road, where a wider lot is required?

Is any part of the parcel in the flood zone or the floodway?

Will the parcel need a septic permit and a well permit, and will the Health Department ask for a larger lot?

Dealer Quote Responsibility Questions

Ask who owns each step before the project depends on it.

Is the home a double-wide or a single-wide — and if a single-section home is wider than 12 ft, which class has the county given it?

If the home is a single-wide, is the parcel in AR-30, the only district that allows one?

Is the masonry foundation and brick or vinyl curtain wall in the price?

Will the home sit with its long side to the road, as the county requires?

Is the parcel in the floodway, where a new home is not allowed?

What To Gather

Better details make county and provider questions clearer.

Property address and parcel identification number.

Whether the parcel is inside a town or a town's ETJ.

The home's width, length, number of sections and HUD label.

The FEMA flood zone for the parcel.

Whether water and sewer are private well and septic or public utilities.

Related provider types

Related project stages

Source notes

The classes, districts, home rules, lot sizes, park rules, floodway rule, flood-zone skirting rule and tree rules are read from the Edgecombe County Unified Development Ordinance (adopted 2021-11-01, last amended 2026-06-22), read 2026-09-08 and re-checked unchanged 2026-09-11. The use table was read from the rendered page.

Only the AR-30 footnotes were read in full. The R-30, R-20 and R-10 figures are from the table body, and the R-20 rear setback was not read.

The flood-zone and floodway address counts join FEMA's National Flood Hazard Layer to the state address file, 2026-09-08. The flood-zone count covers 140 of 276 flood areas and is a floor.

About 1 in 3 addresses is outside every town and town ETJ, measured from the state address file and the state's town-limit and ETJ map, 2026-09-08. Two towns' addresses are missing from the address file, so the true share is lower.

Which class a single-section home wider than 12 ft falls in, and how the county treats two to four homes on one parcel, are UNKNOWN until the county answers.

No written answer from Edgecombe County Planning is on file for this page.

Town ordinances were not read. Everything on this page applies outside town limits and ETJs only.

This page carries the offices, not staff names.

No zoning determination, permit outcome, flood determination, septic approval, or inspection result is implied.

Helpful Next Steps

Move from Edgecombe County questions into the right My Manufactured Home Guide path.

Use these pages to organize the next question by stage, responsibility, utility path, setup readiness, or private project summary. They do not replace county, utility, AHJ, or professional confirmation.

Manufactured Home Land Check

Will this Edgecombe County land take a manufactured home? Find out before you commit to buying the land, or the home.

Buying land, already own it, or selling it — one report on what the county and the land will allow.